03 January 2016

Addition to the last post

Well, I was perusing my queue on Ravelry, and for whatever reason, I was reminded of a shawl I've been drooling over for a few years;

Aquila Shawl by Sari Anstrom

It's a Finnish pattern without an parallel English transcription, but so many people have knitted it (175 on Ravelry), that there's quite a few sets of English translations of the stitch meanings for the chart. That'll do for me. I think it's a stunning design, and I've not knitted it before now because I wanted to find just the right soft greyed-brown yarn. Which, really, I've not been able to find no matter how much I wanted it. So, because I want to knit this lovely beastie, I'm going to use my skeins of white no.8 crochet cotton and see what happens. I've wound up half of it (it came as a bunch of 10 10g mini-skeins). The reason is that the pattern says to repeat section/chart A until half the weight of yarn is used and then knit the other section/chart. I figure I'll get a nice length of shawl for everyday use. I might decide to dye it, and I might not. There's a lovely white one in the project display page, and I'll be happy if mine looks anything like that one.
Anyway, time is wasting, and I've got to go knit.

Later.

Onwards!

01 January 2016

The project round-up of 2015.

Well, I was ticking along, knitting a little everyday, and honestly, until about October, I thought it would be something of a damp squib. I had felt like I'd done nowhere nearly enough, and my finished project list reflected this. Then three days after my "musings", something took hold and I became a knitting daemon and by the middle of December I was rather proud of myself. One project I really was determined to finish didn't get done, and I'm rather sad about that. But, it's a good contender for finishing in 2016 (got lots of seaming to do and it's awkward, but not impossible).

Onwards for a good chance of finishing 16 projects in 2016. As last year, I plan on finishing at least 3 long-term projects - with no pressure. I can do it, I can do it, I can do it. . . .


Well, here it is again, my completed (and not-so-completed) project lists of 2015.

Projects Completed in 2015 (long-term projects marked *):

Flip-Top Mittens
Camera Case
Nori Shawl
Quant #2
34 Leaves Shawl* (started 2012)
Ten Stitch Twist Blanket #1
Clapotis Shawl #2* (started 2007)
Secret of the Stole II * (started 2008)
Ditty Bag #2
99 Percent Hat
Queen's Garden Shawl
Lap Blanket for the Cold
Brea Bag* (started 2012)
The "Almost Lost" Washcloth #1
The Final Multnomah+ Shawl (#3)
Leafy Washcloth #1
Helen's Washcloth #1
Summer Mystery Shawl (#2)
Mermaid Jacket * (Finished just under the wire. Almost literally. I finished the last i-cord sleeve edging on the 30th.) . I still have 1 hole to repair, but all the knitting and sewing of seams is complete. I'm so happy!). (started 2011)

Projects Started in 2015 (But not finished):

Ten Stitch Blanket #2
Papyrifera Shawl (I had great hopes of this being an Christmas gift, but I lost "oomph")
Feather and Fan Scarf (it was a project to use some angora wool)
I Flap My Wings and Glide Shawl
Taliesin Shawl (Granted, I started it in December 2015 - and even with the best will in the world, I couldn't finish a 1600m cabled shawl in a month.)

Projects Worked on in 2015 (but not finished):

The V-Necked Sweater (I'd hoped to get this finished in 2015, but to be honest, I lost "oomph" in October. I'm hoping this will be finished by July 2016.)
Beaded Muir Stole
Indian Shawl
Icarus Shawl
Cherry Leaf Shawl
Saroyan #2
More-Than-a-Triangle-Shawl
Grey Rhodion Stole
The Spider Web Half-Hexagon (+1) Shawl
Funchal Moebius Cowl
So Long Duster
Jack Skellington Hat
Orenberg Shawl
Spring Blossoms Square Shawl
Foreign Correspondent's Scarf
Luna Flickering Flames Skirt
4-stitch Scarf (it used to be "3-Stitch Scarf")
Construction of the Cotton Square Blanket

Projects I'm hoping to Start in 2016 (provided I finish other projects) I have both the yarn and the pattern for each project:

Sagrantino Shawl
Hemlock Ring Blanket
Ecotone Shawl or Mariposa Shawl (I love both shawls but even after months of trying to decide, I just don't know which one to knit with the yarn I have designated - I guess I'll have to swatch both and see. *sigh*)
2-Colour Under Dutch Skies Brioche Shawl (This is also my "learning new knitting technique" project for 2016, as I haven't yet done Brioche Stitch in any form at all)
Leftie Shawlette
Semele Shawl
Igneous Stole
Storm Cloud Shawl/Shawlette
Holden Shawl #2
A Cardigan for My Father (I forgot the name of the pattern. Oops.)
A Diagonal Blanket #2 for my father, smaller than the first one.

As always, I've got to go knit.
ONWARDS!!!!

Later

31 October 2015

Hat Plan for August 2016

A little back story here.
I'm a volunteer for Manchester Pride. 
One of the things I've done for a few years is to be a parade steward. It's not a taxing job, it entails walking with a parade float (one side of the road, and someplace in its designated space) and stopping the watchers throw themselves into the path of the parade, and, also to make sure it doesn't lag too far behind the entry in front. The parade's about a mile and a bit long. 70% of the time it's sunny and there's maybe a sprinkle or two of rain. 
I finally got a hat this year, but to be honest, I don't much like it. It's not truly what I wanted (a natural-coloured straw hat with a medium-wide flat brim) and I ended up getting a woven paper green-and-white cloche-brimmed hat. It did the job, and I made a very nice braided/plaited rainbow ribbon for it. I'll admit, it was cute, but again, it wasn't what I *really* wanted.

So. 
To solve my pickiness (I could look at hat after hat and be unhappy with one aspect or another. Not a solution), I have a plan.

I'm going to knit a raffia one in 2016. I've seen enough crocheted ones for sale that I know it's a feasible project. So, I've got a supplier I can go to (Fred Aldous) to see if the raffia is good enough and (bonus for me) the cost of 500g of raffia will be *much* cheaper than buying a raffia straw hat. I have a hat pattern. I have a plan. Now lets just hope that both I and the raffia are good enough to get it done for the end of July 2016.

Later.

28 September 2015

Knitting and the Hope for 2015. . .

Ok.
I've completed 10 projects this year and I'm in the process of finishing off 2 more.
One (Queen's Garden Shawl) needs washing and blocking and the other one (Lap Blanket for the Cold) needs the ends sewing in and washing and drying (I'm not going to block it - I think it needs to be fluffy for warmth and blocking won't help that, but I'll see when its dry. If I'm wrong, it's easily fixed). They both need to go into the freezer afterwards.

I have 3 (a Purse (Brea Bag), a Jacket/Cardigan (Mermaid Jacket) and a Sweater (V-neck Sweater with saddle shoulders)) that could be finished by the end of the year, but they all depend upon me having sufficient concentration. My insomnia is impairing that concentration and I'm feeling a little bit low and hence, that also impairs my concentration and buggers up my self-esteem, so I'm not fully convinced that I could complete one, never mind all three within the year. I'm really hoping my insomnia does one, and soon. I logically know full well I could do all three if I work on them even a little bit every day, but I just look at them sitting there and I don't want to. It's simple stuff that needs doing:
The Purse needs 3 things finishing - the lining cut out and sewn up (2 day job), the strap to be knitted (a week at the most) and then all the components sewing together (2-3 days) with the hardware and an edging crocheted along the edge (a day). It's a nice bag, and it's been sitting around for too long.
The Jacket needs to be finished, but I don't know if I could wear it. I've gained a bit too much weight since I started it and I think that's also impairing my wish to finish it (The i-cord edging (a week) and the sleeves (2 weeks) are all that need knitting before I sew it up (3-4 days)).
I'd like to finish the Sweater before the cold weather kicks in here. I'd like to be able to wear it at least once before the end of the year, but I can't get the oomph to work on the sleeves (1-2 weeks) (that and the neckline (2-3 days) are all that needs finishing before I sew it up (3-4 days).

I have at least 5 more projects, each of which could be finished within 6 months - all shawls. I've been working on the body of one lately (Cherry Leaf Shawl) since it only needs 3 repeats of the pattern (10 rows each) to compete the body of the shawl and then I need to start on the knitted on border. It'll take about 2-3 months of daily work to complete that, but with the work that needs to be done on the previous projects, it's not likely to be completed this year, which is why I put it into this paragraph. The other shawls are The Spider Web half-hexagon shawl (only the border left), The Papyrifera Shawl with beaded edging, The I Flap My Wings and Glide Shawl and The Saroyan (#2) Shawl. I'm hoping I complete all of those next year, along with two other long-term projects, though I don't know which two at this point. Oh! There's also a Sweater (So Long Duster) that could be completed by the end of 2016, but I don't know if it will. *sigh*

I'm going to go. I feel a little bit better about my prospects to finish the knitting on something else this year, and that's making me a bit more confident about things in general. I think I'm going to go knit on the sweater sleeve I started. It might just help a little.

Later.

21 June 2015

Knitting. Reading. Knitting. Reading.

I'm doing little bits of both often.
I don't seem to have the patience right now to do more than 15 minutes of anything, so doing little and often is working. I've finished projects and books, so its working.

It's better than doing nothing, watching TV and twiddling my thumbs feeling as if I *should* be productive but not actually doing anything.

Off to knit some and read some more. I'm in the mood to start a project, but I'm determined not to until I finish at least 2 more projects. Here's to good intentions. Let's hope I do this.

Later

01 January 2015

2014 Knitting

Projects Finished:

Rainbow Scowl (scarf/cowl)

Simple Garter Stitch Scarf

Maine Morning Mitts 4a

Maine Morning Mitts 4b

Ten Stitch Baby Blanket in Chunky yarn

A Simple Pouch

Cassandra Shawl + (minus edging as I ran out of yarn)

Tudora Cowl (finally finished, started 2008)

Calorimetry Headband #2

Calorimetry Headband #3

Arroyo Shawl

Ditty Bag #3

Wombat Shawl

Cabled Samsung Sleeve (with pocket)

Ten Stitch Twist Baby Blanket



Projects Started (and unfinished) in 2014:

Grey Rhodion Wrap

So Long Duster Cardigan

Lacy Pullover (scoop neck reversable top for Susan)

Quant Headband #2

More Than a Triangle Shawl

Lap Blanket for the Cold

V-Neck Sweater


Projects in Progress at the end of 2014 (yes, there is a difference):

Ditty Bag #2

Beaded Muir

Grey Rhodion Wrap

Indian Shawl

V-neck Sweater

34 leaves Shawl

Nori Shawl

Spider Web Half Hexigon +1

Clapotis #2 (still weaving in ends)

So Long Duster

Lacy Pullover (for Susan)

Quant Headband #2


Luna Flickering Flames Skirt

Prayer Shawl #2

Saroyan #2

More Than a Triangle Shawl.


What do I have planned for 2015? Well, I plan to finish 15 projects, 2 of them being long-term projects. Other than that? Well, let's just see what happens. . .

10 June 2014

General Update - for want of a better title

   Ok, I was going to give an update about something that happened in an earlier entry, but it was so insignificant, I've forgotten what it was. Never mind.

   The knitting is still happening (no surprise there). I've cast on two more projects:
A cardigan from a Woman's Weekly Knitting and Crochet special edition and a Large sleeveless sweater for my best friend. They're both in the same yarn (King Cole Opium), but Mine is in Light Blue and hers is in Black.

  The garden is still being ignored. Two house plants have died (not my fault), and I'm thinking how to replace them. I want a spider plant and a succulent, but I've yet to go out and look or search on the 'net. It will eventually happen.

  I have plans to sew seeds for some more herbs, as the ones I sewed last year are reaching the end of the road. I left them for 10 days to be cared for by my Dad and that didn't happen - I shouldn't have been surprised really. I did revive them when I got back, but they're not very well at all.

   The book reading is slowly increasing from last month and I'm happy with my progress. I'm reading a book a week and I'm catching up on my pile a bit...or I would if I hadn't discovered the 3 books for £5 at The Works. I'm not discovering enough to be worried about it overall, but, there's enough stuff I like that I'm not going to have a lack of books to read (and I already had a *lot* of books to read).

Ok, I'm off. It's late and I should be asleep.

Later.

03 May 2014

Knitting Pile

Well. My plans for reducing my knitting to-do pile have gone completely out the window.
I'm completely nonplussed about it.
I really don't think that I'm disappointed in myself, since I'm not surprised, but I'm also not going to beat myself up about it.
It is what it is. I like knitting, I like starting projects and while my intentions are good to finish projects, I get bored.
My biggest problem is that I have to keep an eye on them for insects, but it's more of an inconvenience than anything. I like my knitting and don't want it damaged, but if I honestly cared about it as much as I should, the projects wouldn't sit there untouched.

Having said that, I finished the knitting on a shawl (Cassandra+) and it's sitting there waiting for me to sew in the ends before I can take it upstairs to go in the pile for washing/blocking. That'll get done in a couple days (the sewing in, not necessarily the washing/blocking). Got to do knitting on a couple projects before that happens.

Ok. I'm going. I only signed onto Blogger to see what to do about a recent e-mail and it's been dealt with to my satisfaction.

Later

16 March 2014

Another entry on My lap.

Well, I'm not exactly au-fait with fingertip typing, but, I'm getting better. It helps that I'm slightly addicted to My Toy. I haven't stopped knitting every day since the last entry,  and while I haven't actually finished another knitting project, I'm happy with my progress.

I had a minor house incident yesterday and was quite shook-up, and so I've started another knitting project to calm myself. It's a Wombat "Shawl". I had bought two colours (beige and a soft jade green) of this lovely merino yarn and used the greater amount (the soft jade green) to start a sweater (which I have described in an earlier entry) and the latter amount was sitting there taunting me. I used yeterday as an excuse to start knitting with it, and it's absolutely lovely.

    To be honest, the minor calamity ended up being a lot of noise and smell, and will be tacked tomorrow (hopefully). It's not a small problem, but it's not something I'm going to describe until it's fixed.

Anyway. I'm in a bit of a mental fluff state, and while I had this great post planned, I can't remember exactly what I wanted to say. It (of course) involved knitting, but I also was going to include books and cooking.

Oh well.  When I remember it, I'll type it up and post it.

Until then.

Later

23 February 2014

New way to post. . .if I like doing it

     Well, I've got a new toy-a Samsung Galaxy Tab 2 7.0. I bought it second hand,  barely used, luckily,  and I'm still learning how to use it.  The keyboard is a bit small for my fingers,  so I think I'll go and buy a pointer for it if my dexterity doesn't improve in a couple of weeks. I'm knitting a cover for it - another cabled cover like the one I made for my kindle, only with Noro Kureyon instead of the Manos I originally used. I'm liking the colours and if the size is a bit small like I think it will be (I used a 4.5mm needle instead of a 5mm)  I'll swap them over. The kindle cover is stretching out a bit with age, though I'm sure that a good washing would improve it. The Samsung is slightly bigger than my kindle.

    I'm knitting every day (whether I want to or not), and seem to be getting little accomplished,  but I think some of the factors in that are the 4 projects I've cast on (that I said I wouldn't do).

Never mind. It's not the end of the world. So far, I've completed 3 projects a month (yes, I know that it's only February), and with the progress I've been making,  I think it will continue for a few months yet (eternal hope is always a good thing), but if not, I'll get at least one project a month done, that is for sure.

Later.

12 January 2014

What am I doing? Why?

As can be read in the previous entry, I made a new year's promise (not a resolution, as those spectacularly fail) to complete at least 14 Unfinished Projects.

The problem is, As of this week, I've either cast-on, or am planning to cast-on 6 projects. SIX! ! !

I really hope that I have the strength to complete my promise to myself. I do honestly know that I can actually do it (mainly since half the projects I want to finish only require sewing in ends or sewing up the seams.). But I'd like to finish at least 8 projects on the needles. Goodness knows I need to do that.

Come on self, you can do this!

Projects started:

Toriot Mitten KAL (fair isle knitting in fingering weight)

Arroyo Shawl (worsted weight)

V-neck Sweater/Pullover (Jade Green bulky weight)

Cassandra Shawl (worsted weight).

I'm not going to list my planned projects, because if I'm as smart as I think I am, I'll finish two projects (out of any projects) before I start another - so I might change my mind and then finish another two.

Here's hoping.

Later.

31 December 2013

2013 - Happy New Year to 2014

Well, 2013 was both productive and leisurely.

I finished 31 Knitting Projects:

Ayli Hat

Simple Lines Shawl

Light and Up Shawl

Moonlight Sonata Shawl*

Flip-Top Mittens #1

Wingspan Shawlette #1

Bellflower Cowl

Ditty Bag #1

Not-so-Raspberry-as-Cherry Wrap*

Pearly Pink Queen Shawl

Feather Lace Wrap-Scarf

Namaste Yoga Bag

My WWWW Headband

Cabled Tea Cup Cozy

Moss Stitch DROPS headband #1

Mistaken Shawl #2

Mistaken Shawl #3

Moss-Stitch DROPS Headband #2

"Red" Robin's-Egg Blue Hat

Multnomah Shawl #2

Tea Pot Cozy

Garter Stitch Fingerless Mittens

Riot Hat

Lacy Baktus #2

Wingspan Shawlette #2

Holden Shawl (expanded from Shawlette)

Maelstrom-Vortex-ish Circular Shawl*

Fingerless Mittens

Prismatic Scarf

Daisy Stitch Headband

Patchwork Jacket*

(*) indicates long term projects.

Knitting projects started but unfinished in 2013:

Nori Shawl

Muir Shawl/Wrap (Beaded)

Flip-top Mittens #2

Foreign Correspondant's Scarf

Funshal Moebius Cowl

Icarus Shawl

Jack Skellington Double Knitting Hat

Saroyen #2

Knitting projects worked on in 2013:

Indian (Indinski) Shawl

Eyelet Gloves

Gothic Lace Mohair Scarf

34 Leaves Shawl

Mermaid Jacket

Orenberg Shawl

111-27 Knitted Jacket (DROPS) (re-started due to me losing my place in the pattern)

Prayer Shawl #2

Clapotis #2 (Having to sew in an indeterminate/endless number of ends is daunting - still)

Cherry Leaf Shawl

Diagonal Basketweave Blanket

2014 is going to be a year of completing unfinished projects and another year of clutter removal. I have too many of the former and too much of the latter (still). I'm not specifying how much of either I'm completing/getting rid of, since I don't want to depress myself with unmatched targets. Though I'd really like to complete all of my unfinished knitting and clear a (collective) a room of clutter, if I'm honest. That'd be great.

I'm not sure what exactly is happening with my garden, but so far, I don't care. I'm very tempted to rent a skip and toss most of it away. I'll see what happens in 2014. If I'm as lethargic about it as I was this year, I think it's going to go. We'll see.

The book reading hit a wall in June. While I hadn't been avoiding it, I just didn't have the drive to finish books that I had in 2012. I don't think it's bad, but I'm not exactly happy about it if I'm honest. I nearly read a book a week, and while many people would be more than happy with that, I'm proud to be a bibliophile. So I'm (again) going to try and read 100 books in 2014. I've a lot (LOT) of books in a pile I want to read.

The rest of the crafting (Beading, Needlework, Cross Stitch) is ticking along nicely. I even managed to do some machine sewing this year, which pleased me. I'm hoping to sew a few tops in 2014 and finish my needlework miniature rug. They're both possible.

Later.

20 November 2013

Knitting on hold

   Well, I finally finished the Maelstrom shawl and it looks lovely. I've got one last thing to do to it, which is weave a pearlescent thread through one of the K2tog ribs from the edge of the body to the centre. It isn't time sensitive, and it'll get done when I find the right thread.
   Last week I started a Jack Skellington double knitting hat (white with black design on one side, black with white design on the other) in King Cole DK merino blend. It took forever to learn the tricks knitting it, but I'm in the middle of the first earflap. At the rate I'm knitting, the hat will be ready for next Christmas. I expect it's really because doing increases in double knitting is very time consuming. Once I'm onto the body of the hat I should be a lot faster. I very much hope so.

  The reason for the no go in the knitting is because I'm being more active in beadwork and jewellery making. I think I just need a bit of a break from knitting after being so immersed in a large project. I hope that's what it is, anyway. I am planning future knitting projects (including buying yarn for them), so I'm not planning on the knitting "go slow" for long.

Short entry today. Got things to do.

Later

23 October 2013

Everything and Nothing. It's all the same.

   Well, I've spent the last month knitting on one of two things - either the Maelstrom shawl or the Nori Shawlette. It's been satisfying, but boring. I'm 95% done with the Maelstrom, and if I keep at the pace, I'll be done in a week (don't think it's going to happen though). The Nori increases in the latter half of the repeat by a total of 5 stitches, and so, by logic, each repeat takes longer to complete. Right now, a row takes 15 minutes, and I'm only on the 2nd ball of 3 in the increase section. I'm lucky in the fact that each row in the repeat changes slightly, so I can't coast through the knitting.

   All this concentrated knitting does mean that I've not finished any projects - or started any. I have, however, given a promise to knit two hats. In double knitting. This means that I have to start one after I finish the Maelstrom. The hat is the "Double-Sided Jack Skellington Hat" by Alyshia West. The yarn has been ordered (King Cole Merino Blend DK in both black and white), and all I need to do is go and get head measurements. That (hopefully) will be done next week - provided no one gets ill and asks me to postpone my visit. I'm truly crossing fingers that doesn't happen.

  I still (obviously) haven't up-loaded any pictures to Flickr. I'm sort of surprised. It's a good storage site.

   I've gained another class, and this means I now only have 2 free days a week. But it also means that on average, I'm doing over 8 hours of exercise a week. Not bad for me. Aw, it's amazing for me. I feel good about it, and I feel better overall.

  Well, everything else is ticking along. I'm fine, the house is fine, the garden is the same, and I'm going to go so I can do more knitting to catch up for the last two days.

Until later.

07 September 2013

Time goes by so quickly . . .

I've been busy saving the world with two sticks and some string....*snicker*

I've been nibbling a bit into the unfinished project "list".

Ok.
Finished:

Ruby Reds Wingspan, blocked out. I love it. I'm looking forwards to the winter, just so I can wear it.

Stripey Lacy Baktus. I blocked it out a bit curved, and the sides are a bit spikey. Yay!

Purple Riot Hat for Prismatic Scarf. It blocked itself out perfectly. I was a bit worried, but I like it a lot. I'm only half-way through the scarf, but it'll get done. . .eventually.

Blue-Green Striped Easy Garter Stitch Fingerless Gloves. I like them, but I'm not quite sure about them. I'll only be able to tell if they're a keeper when I actually wear them outside.

Denim Blue Multnomah Shawl. It blocked out to just the size I wanted. Yahoo! I also washed and re-blocked out the original blue-green Multnomah shawl and it's looking 10 time better than it did originally.

Burgundy Robin's Egg Blue Hat. I tea-dyed and hand-coloured a wooden button and while the button doesn't look quite as cute as I wanted it to, I like the overall look of the hat. Another one that blocked out nicely.

Burgundy Moss stitch Drops Headband and Olive Green Moss Stitch Drops headband. The red one's for me, the green for Susan. It goes with -

Olive Green Mistaken Shawl (same yarn - Louisa Harding Fleuris). I hate the yarn. Not for the feel, but for the chinzy weight and foam insert. Grrr. It's a good thing that I got the yarn on deep discount, or I'd have sent it all back with a nasty letter.

Burgundy Mistaken Shawl. I'm so happy I've finally completed the replacement for the original shawl.

Wwww # 1 - It's soft inside (alpaca lining) and looks great.

My freezer is stuffed with finished items. Luckily, most of them will be "done" in 2 weeks.

But, I've now only 43 or 44 projects unfinished (including the started ones underneath). It's good.

Projects started:

A second Ditty bag in pink silk and pink cotton. The knitting's actually finished, though sewing in the ends is proving to be a bit of a nightmare. So it's in limbo for a bit (quite a bit, really).

I had to re-start my 34 leaves shawl, as a bug/beetle (not sure which, don't care, I was mad as hell when I saw it) ate a hole near the beginning that I couldn't repair. I was 2 rows away from starting the border. Grrr.

I've finally started (and am 3/4ths of the way through in about 10 days) the Holden Shawl (Holden shawlette, but I wanted it bigger the first time I saw it) - in Noro Silk Garden Sock yarn (colourway S8 - F). It's really gaudy for me, but it's SO cheerful. I love it in a queasy way. *snicker*.

Right now I'm primarily knitting again on the Maelstrom shawl (finally!), and I think in the time I left it alone it's become a black hole shawl. I'm halfway through the last repeat, and I never seem to be any closer to starting the border, no matter how many hours I knit. . . .I'm also knitting more on the hexagonal shawl (I'm actually on the border on this). It's another black hole shawl, but it's soft and pettable *snerk*.

Ok, I've got to sign off. The last night of the Proms are on.

Later.

29 July 2013

What!?!?! How many!?!

My, my, my. I was trying to rejig the way my Ravelry project list looks (decided to put it back to what it was) and I discovered I had 50 projects in various states of unfinished (ranging from just started all the way to it's been knitted, sewn and only needs to be blocked).

That's very embarrassing indeed.

I am churning out and finishing quite a few projects, but right now, there are more new projects being finished than old ones.

So, as of last night, I finished a teapot cozy, washed a shawl that's been sitting on the side-lines for over a month (got another one to wash, but it's an old one that's going into storage until winter) and a hat. So my list is now down to 47 (still too many, though).

I think, that as much a I'd like to start a new project, I really need to buckle down and renew my new year's resolution of cutting down on unfinished projects. I know that I'll never be one for having under 10 projects on the go, but nearly 50 of them really is a bit much.

Ah well.

I'll leave it at that. I've really got to go knit. *g*

29 June 2013

Whee!

I've been on line and discovered that Flickr have removed their ridiculous limits on photos and given everyone 1TB of space. It's GREAT!
I can start using it again. Yahoo!

Oh, about the knitting. Yep, I am. Projects finished:

Pink Pearly Queen
Feather Lace Scarf (it's huge and it's  bit strange with 3 pink "stripes" in it, but it's MINE)
Namaste Bag (Yoga Mat Bag) in Grey Aran-weight Cotton.
My wwwww#1 (fair isle headband) in 5 shades of 2-ply Jumperweight by Jamieson & Smith)
Cabled Tea Cozy (a paper tea cup holder) in grey marl 4-ply (leftover 2-ply Jumperweight)
A Ditty Bag (it's a small bag for holding 2 small MP3 speakers and their cables).

Projects Started:
Nori Shawl (knitty) - in Dark Green 2-ply Jumperweight.
34 Leaves Shawl (Lankakamero) Originally started Nov 2012, I'm working on it.
Funchal Moebius (Kate Davies) A colour-work cowl in 2 colours of fingering-weight yarn (King Cole & Texere Yarns Wool City).
2 Mistaken Shawls (one is finished on the knitting (Green one)) and now waiting for the ends to be woven in) One in Louisa Harding Fleuris (Box) and the other in Bulky Wool by Texere Yarns (Claret))
Wingspan #2 in EasyKnitter Deeply Wicked in Ruby Reds. (I'm hoping to go to Purl City Yarns this Sunday as they're having a trunk show of EasyKnitter Yarns).
Lacy Baktus #2  in Lana Grosse Meilenweit (4-ply mainly cotton sock yarn) colourway 3006.
A Robin's Egg Blue Hat (Rachel Iufer) in the leftover Fleuris from the Mistaken shawl

I think that's about it for this entry. I've not yet started abking and I haven't yet picked up the Maelstrom shawl. Don't know at this point when that'll happen.


Later.

21 April 2013

It's Dancing Time!

I am a VERY happy person.

I found my camera!!!! *cheers, dances* I knew I missed it, but I hadn't realised I missed it as much as I had. . . I'm SO happy I found it. I keep thinking about it waiting for me to use, and I start smiling.

So why am I sitting here typing this rather than going outside and taking photographs? Well, it's raining. My camera doesn't like rain. It's a pain in the bum, but that's the way it goes.

So. I'll be taking photos in a couple days once my knitting is done - and I can also finally take some good photos of the knitting that just can't be captured nicely on the mobile. Yahoo!!!

Anyway, onto the knitting:

I've finished a few projects in the last few weeks -


Ayli Hat - It needs to be re-blocked, as I did that in a hurry and while it's ok, it could fit just a little better.

Bulky Flip-top Mittens - they are great. I have started another pair in a soft green-grey, and I have requests for another 2 pairs. I'll get those done for October (I hope).

Simple Lines Shawl - I beaded the border and it's just so pretty. I can't wait for the weather to wear it.

Light and Up Shawl - I waffled a bit and after blocking, I added the tassels. I like it very much, though I'm unhappy that the weather finally decided to warm up. It means I can't wear this (it blocked out bigger than expected and while light, it is too warm for spring/summer). Drat.

Wingspan - I found it fun and quick to knit. I didn't block it, as I really didn't want to. I also found that in sunlight, it's MUCH more vibrant than I was looking at under an energy-saver bulb. What a surprise!

Not-so-raspberry-as-cherry-Dream stole - and I've got to say, even unblocked, it's Gorgeous!

Bellflower lace scarf (now a cowl) - It didn't turn out as I planned, but it's nice and it will work.
 
The last two items need to be blocked, but I just don't want to pin out anything at this moment. I'll get 'em done "soon".

New Projects -

I FINALLY started the Muir Stole/Shawl in Natural Dye Studio's Angel 1-ply in Aqua. I'm adding delica beads to the leaves and while I've only done 8 rows, I LOVE IT!

At the end of March I started a pair of "Easy Garter Stitch Fingerless Gloves" in Regia Ombre Stripe (blues and greens). I've had to re-start them - I added a thumb and re-jigged the wrist short rows. They're a side-project and I'm taking my time.

I watched the Fiddler on the Roof a couple weeks ago, and saw a stole I liked. Trawling though Ravelry, I couldn't find a stole pattern that even remotely matched it (which was surprising), though I did find the "Foreign Correspondent's Scarf" that had the same lace pattern as the stole. I started the scarf in Zettl Treviso (navy blue), and it's interesting.
I'm sort of drafting/making notes of a pattern for the stole. I'll definitely have to do a test run of it, but I know I'm on the right lines.

About three weeks ago I started "Pearly Queen". I'm knitting it in Zettl Melisa (pink). It's about the same as the requested yarn. I'm not sure about it though - but that's more the colour than anything else. It's an easy and quick knit, but a little fiddly as I've had to change the way I throw my purling. It's not a problem, just a little different.

Old Projects -

I'm over halfway done with my feather lace scarf (started 2007). I looked at it recently, and it's actually more the width of a stole. I'm hopefully going to use it as a scarf, though I'm not convinced. I think it'll stretch significantly in blocking. All will reveal itself eventually.

I decided at the end of March to give the Maelstrom shawl a rest for a bit. I was dreading the thought of even picking it up, so it was packed away. But. . .I expect the way I've been thinking about it lately means I'll be getting back to it either in May or June.

I've been working on other projects, but, as I'm not sure how much time I'll take to finish them, I can't really give details on them.

If I finish another project this month (ha!), I'll start another shawl. I though about making a sweater, but honestly, I want another shawl. Oh who am I kidding. Once I finish another project, I'll be starting another shawl. There.

Food news next:

I'm really getting into making Japanese Pickles (tsukemono) and I've dicovered I need a couple ingredients (perilla leaves and yuzu) I can't easily get for the pickles I want to end up with. I'm going to be buying the seed for the perilla leaves (both red and green). I have no idea what I'll do about the yuzu, but so far, lemon peel is working. I am happy with what's happening so far - though they could be just a bit better with the perilla leaves. To be honest, I would love to make rice bran pickles, but I'm not convinced I've got what it takes to keep them happy while fermenting. Therefore, I'm just concentrating on quick pickles, and all is good.

My next foray into baking will be making vegan pies. I've got what seems to be a good cookbook (yes, it's "Vegan pie in the Sky"), but unfortunatly I need the counter space. That's a big problem right now. Once that's fixed, watch this space. I'm in the mood to make a chai apple pie first.

And finally, just in case you hadn't figured it out, my emotional health is MUCH better. I don't know what happened, but about a week - 2 weeks ago, it was if a cloud had lifted. I'm definitely not complaining. It's a little weird in my head, but I'll go with the flow. It's preferable to the way it was before.

Ok, I'm off. I have reading to catch up on. I finally got my copy of "Dangerous Liaisons" returned to me, and I'm on letter 16.

See you later.

04 March 2013

Life isn't unkind

Well, the knitting on the vortex/maelstrom shawl is coming along. I decided it's been ignored enough. I'll knit on it until I get fed up and want to throw it across the room. To make me feel better, I've started 3 small projects - 2 scarves (prismatic scarf and a bellflower lace scarf that started out as a headband) and a shawl (light and up shawl).

My GOD I hate this keyboard. Some of the keys are stiff and don't register unless you're imagining you're playing along with Beethoven's 5th. Arrggh! It's not even 6 months old, this laptop. What a PAIN!!!.

. . . Anyway. The knitting is progressing ok. I'd like to say nicely, but I'm not in the >50% mood to knit. I'm having another month of "not wanting to knit". It's killing me. I "want" to knit, but the thought of knitting another 800 stitch (and increasing) row on a circular shawl that seems to have no end (though I DO know there's only one more repeat after the next 10 rows) in sight is getting a tiny bit annoying. But, the good thing I have to look forwards to is the pretty border. Right now, I'm definitely making the border a carrot to keep me going. 
 

You see, I know what part of the problem is. . . I'm grieving, and I'm refusing to properly grieve.

I have NO idea why. I really don't. Anyway. It's MY problem, and I know how to deal with it, but I need to know I'll not be interrupted and totally alone. So It'll be awhile, and until then...I'm hoping I'll be ok.


  But on a better note for the knitting, I've finished the knitting and sewing on the Simple Lines shawl. I even beaded the border. It's lovely, but it'll be better once I lightly block it. Unfortunately, I don't know when that'll be.

So. The house cleaning slowed a little bit during the last couple weeks of February (I was a bit ill and didn't have the energy, if I'm honest), but I've gotten most of the recycling (so far) out of the house, and that felt good. I'm planning on culling a "few" more books and a few more clothes this coming week.

Ok, I'm done with this. Later.

08 February 2013

Tilting at titles . . .

Knitting recently started:
Simple Lines Shawl by Maanel. Yarn: Panda (DK bamboo blend) in Dark Grey by Zettl.
Wingspan by Tri'Coterie Knitting Designs. Yarn: Deeply Wicked (fingering merino) in Pond Scum by Easy Knits.

I'm taking these with me when I go voluntering at the Creative Stitches and Hobbycrafts Show. I started yesterday and really didn't get to work at all on either one. It was fine, though. It was amazingly busy and the time flew by. I'd like to do it again next year. We'll see though, as I've just indicated that I'd be interested in helping with hows that the Knitting and Crochet Guild have on in Manchester. I think that the future might be busy....

Books:
Well, I'm back for another year with the Goodreads reading challenge. I'm going to try again with reading 2 books a week (104 books this year). It's working so far, and I'm 2 books ahead.

Garden: No go.

House cleaning resolution: It's ticking along. If I continue working like I have been so far, I'll do it easily by July. I'm not holding my breath though. I have to stay cynical, so I work at it. I'll be happier in the end if I do....

Craftwork: Hibernating. The cross stitch and beadwork is keening in the background, but I've other things to do. If I'm good at the house de-cluttering, I'll reward myself in June. . .

Food: I've gained inches and feel lethargic. I'm not dieting, but I'm trying to not stuff food down my throat, I'm going to my fitness classes and walking as much as I can. My body is trying to get me to "stock up the fat reserves for winter" but I'm not falling for it....I NEED to lose inches. I refuse to check out the scales until I can fit into a size 12 pair of jeans. Come on summer!

Well, that's it. I'll be back as soon as I'm able....